Place the first screw at the outside bottom edge add screws at the other edge and the top of the panel to secure it and finish fastening it with screws about 24 inches apart.
Galvanized roof anchor intsallation.
When framing the roof the spacing for roof trusses should not exceed 24 inches 61 cm and purlins should not exceed 36 inches 91 cm apart.
Adhesive roof anchors are corrosion resistant stainless steel and or hot dip galvanized fully tested to conform to csa standards and ontario ministry of labour regulations and guidelines.
Install the first galvanized roof panel at one bottom corner.
The guardian fall protection snappy disposable roof anchor the guardian fall protection snappy disposable roof anchor is designed to fit any roof pitch.
This product is convenient and disposable.
The panel provides approximately 24 sq.
Fasten it with galvanized screws with plastic washer caps by using a screw gun.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
Installation around the perimeter of the leading edge areas is recommended to ensure compliance and allow the user to easily switch from anchor to anchor.
Roof anchors must be installed and spaced a maximum of 20 ft.
Csa compliant stainless steel and or galvanized suspended stages anchors are manufactured in our facilities by cwb certified welders and are designed for use with bosun chairs lifelines equipment tie backs and in general fall protection and restraint applications to prevent falls.
The guardian fall protection galvanized roof anchor is suitable for wood metal deck or concrete substrates.
The drawing below illustrates the adhesive roof anchor and the installation methods available.
Galvanized steel corrugated utility roof panel is designed for installation in residential roofing applications.
Follow manufacturer s instructions for the sealant application.
This comes with an assembled dimension of 18 in.
Roof safety anchor systems.
Skyline offers consultation with walk through design installation and testing on new rooftop fall protection anchor points.
It is a perfect choice for commercial and residential usage.
These roof anchors are easy to install by nailing into the truss and easy to remove by hammering over the attachment point when the job is done.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
W x 12 in.
Recommended spacing is between 6 and 10 ft.
Install the roofing screws vertically along each rib in the panel.
D x 18 in.
From suspended roof maintenance fall restraint anchorage to rooftop maintenance fall restraint systems or general industry fall arrest or restraint anchorage skyline has the solution for your application.
Methods of installation range from mechanical attachment like through bolting and welding to existing structure cast in place during construction where by the anchor becomes part.